Lock Out Tag Out

Make sure you do a proper LOTO (Lock Out Tag Out) as per the procedure before you do any intrusive maintenance work on the equipment. Ensure that all hazardous energy sources are isolated before the maintenance work is started. Also don't forget to smile 😁 See Product

Vertical Separator and Pump System

This is a design of a combination set that consists of our LM PV20 vertical separator, and two of our LM301 centrifugal pumps in parallel arrangement. One as duty, and the other as backup. N+1 sparing philosophy as we commonly have 😁 And don't worry, we have suctions strainers, discharge check valves, and isolation valves... Continue Reading →

View from Above

One of the most beautiful things at a project site or a plant, is a view from a height. A view from above. Where all the equipment suddenly appear like miniatures to the eyes. Salah satu pemandangan terindah di suatu lapangan project atau plant, adalah pemandangan dari tempat yang tinggi. Pemandangan dari atas. Dimana semua... Continue Reading →

Simultaneous Operations

And by the way, due to the tight schedule, often partial startup and SIMOPs (Simultaneous Operations) is un-avoidable 😁 Where one process train is in operation, while the other is still under construction. Dan btw, karena jadwal yang ketat, seringkali partial startup dan SIMOPs (Simultaneous Operations) itu ngga bisa dihindari 😁 Dimana satu process train... Continue Reading →

Connecting Equipment

In a project, connecting an equipment with another one, is almost always accompanied with challenges. And often, a tough one. But we are here, to take the world's toughest brick challenges 😁 Biidznillaah... Dalam sebuah project, ngehubungin satu equipment sama equipment lain itu hampir selalu diiringin sama tantangan-tantangan. Dan seringkali tantangannya berat. Tapi kita hadir,... Continue Reading →